News

Results Found: 1
Friday, July 07, 2017
CH2M Polar Services (CPS) contracted with Panel Built to design and supply a warehouse mezzanine for installation at National Science Foundation’s Greenland Summit Station, which is located near the apex of the Greenland ice sheet. The physical altitude of the site is 10,600’ above sea level, where wind speeds exceeding 100 mph have been recorded and temperatures range from ...read more
Categories: Small Business