BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20190424T180000Z
DTEND:20190424T190000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Neels Gap Fiber Dedication Ceremony
DESCRIPTION:Everyone is invited to join us for the dedication of the fiber cable recently run via drone on top of the mountain. \n\n\n\nWe will be featuring vidoe footage of the drone at work\, as well as learn more about the technology and the tremendous benefit it provides to the residents of Union County.  Refreshments will be served.  Hope to see you there!\n\n\n\nThis fiber technology seamlessly allows access to determine road conditions on top of the mountain.  Both BRMEMC and GA Power made this remarkable feat possible by using a drone so as not to disrupt the ecology in the forest.
X-ALT-DESC;FMTTYPE=text/html:Everyone is invited to join us for the dedication of the fiber cable recently run via drone on top of the mountain.&nbsp\;<br />\n<br />\nWe will be featuring vidoe footage of the drone at work\, as well as learn more about the technology and the tremendous benefit it provides to the residents of Union County.&nbsp\; Refreshments will be served.&nbsp\; Hope to see you there!<br />\n<br />\nThis fiber technology seamlessly allows access to determine road conditions on top of the mountain.&nbsp\; Both BRMEMC and GA Power made this remarkable feat possible by using a drone so as not to disrupt the ecology in the forest.<br />\n<br />\n&nbsp\;
LOCATION:Event Parking: Byron Herbert Reece Farm Due to heavy traffic and road construction\, shuttles will be running from the Reece Farm to Neels Gap for the Dedication Ceremony Event Location: Neels Gap/Mountain Crossings 12471 Gainesville Hwy Blairsville
UID:e.256.94423
SEQUENCE:3
DTSTAMP:20260418T104837Z
URL:https://members.visitblairsvillega.com/events/details/neels-gap-fiber-dedication-ceremony-94423
END:VEVENT

END:VCALENDAR
